top of page
Specification
This extension to an existing building at Newcastle University meant we had to detail five floors of CMF’s Metfloor 80 floor decking.
Project details
Around 10,000m² of floor decking was detailed on this project, with close attention given to how the new build would adjoin the existing. All work carried out on programme and without any installation issues.
bottom of page